How to Size a DG Set for a Commercial Building
Navyashree Engineers Private Limited ·
A diesel generator (DG) set that is too small struggles to start the loads you rely on. One that is much too large wastes money and can run poorly at light load. Good sizing starts with a clear picture of what the DG must support during a power cut, and it should be confirmed by the electrical engineers responsible for the installation.
This guide explains the questions that shape the decision. It does not give a rating for your building.
Decide what the DG is for
Begin with the purpose. Some buildings need the DG to carry the whole load. Others need it to carry only essential services such as lifts, fire and life-safety systems, emergency lighting, pumps, IT and selected HVAC. Decide which circuits are essential and which can wait, because the answer changes the size of the set and the design of the changeover arrangement.
Build a proper load list
Prepare a list of the loads the DG will support: lighting, small power, HVAC, pumps, lifts, UPS systems and any process or IT equipment. For each one, record the rating, the type of load and the expected operating pattern. Not all loads run at the same time, so the design should consider realistic simultaneous demand and not simply the sum of the ratings.
Starting loads matter
Motors draw a much higher current when they start than when they run. Lifts, pumps, compressors and chillers are common examples. The generator must be able to start the largest motors while supporting the loads already running, without an unacceptable voltage or frequency dip. Ask the designer how motor starting has been assessed and whether starting methods such as soft starters or variable speed drives affect the result.
Power factor and kVA versus kW
Generators are rated in kVA and deliver real power in kW according to the load's power factor. Confirm the power factor assumed in the sizing and the rating basis the supplier uses. Non-linear loads such as UPS systems and variable speed drives can also affect the generator's behaviour, so tell the supplier what is connected.
Site conditions and derating
The output of an engine depends on the site. Manufacturers publish how temperature, altitude and ventilation affect rated output, and Bangalore's elevation and local conditions should be considered. Ask the supplier to confirm the rating for the actual installation conditions instead of assuming the nameplate figure applies.
Plan the installation around the set
- Location and ventilation: Provide space, airflow for cooling and a safe exhaust route.
- Fuel: Decide on day-tank and bulk storage, and follow the applicable safety requirements.
- Noise and emissions: Check what acoustic enclosure and pollution control requirements apply to your site.
- Changeover: An automatic transfer switch (ATS) should be sized and coordinated with the DG and the main supply. Decide how restoration of mains supply is handled.
- Future growth: Consider whether you will need more capacity later, and whether the design allows it.
Testing and handover
Ask what testing will be done before handover, including load testing and checks of the changeover. Request documents such as the equipment details, test records and a maintenance schedule. A DG set that is not exercised and maintained regularly may not start when it is needed.
Link the DG to the wider electrical design
Sizing a DG is part of the building's electrical design. It affects the main panels, the cabling and the protection settings. See our pages on DG, UPS and lighting systems, electrical design consultancy and Super Grade electrical contractors.
Navyashree Engineers can discuss DG set requirements for your building using your drawings, equipment details, site location and access arrangements. The scope and any follow-up work should be confirmed for your installation. Call +91 99808 37999 or use the contact page to request a site assessment.
Related services
Explore our Super Grade electrical contractors, commercial electrical contractors, industrial electrical contractors, electrical design consultants and HVAC contractors. You can also request a site assessment.
Frequently asked questions
Can you help me compare electrical quotations for my project?
Yes. Share your drawings, equipment schedule and site requirements and our team can review the scope with you. Call +91 99808 37999 or use the contact page to request a site assessment.
Is Navyashree Engineers a licensed electrical contractor?
Yes. Navyashree Engineers is a Government-licensed Super Grade electrical contractor. Licence SGL210314BNG is issued by the Department of Electrical Inspectorate, Government of Karnataka.
Where do you work?
Our head office is in Nagarbhavi, Bengaluru, with a branch office on Vignananagar Main Road. We take enquiries across Bengaluru and Karnataka.
Is this article a quotation or a design?
No. It is general guidance. Scope, equipment and responsibilities are confirmed in the quotation for your project after reviewing drawings and the site.